docs: Gate 5 closeout - AAR, harvest, design doc done
The design doc closes with its AAR (planned/actual/why/learnings, the six acceptance criteria checked off 6/6, the session's shakiest calls named) and moves to docs/design/done/ with status done. Harvest: a stolpersteine wiki page distilled from the AAR (hex is not a git SHA, TZ on the git process, python floor, anonymous Gitea negatives, negative tests, directory links), and the neckbeard feedback list becomes issue 0040 - a deliberate separate act, per the design's non-goals. Operational follow-up is issues 0041 (refine imported wartegrund) and 0042 (go-live: push, first mirror run, CI schedule, milestone for gitops#61). Final chain green: validate 0/0 over 36 open issues, gen_status --check current, drift 0, prosa 0. Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
This commit is contained in:
co-authored by
Claude Fable 5
parent
865d761fb0
commit
c481165ab4
+1
-1
@@ -5,7 +5,7 @@
|
||||
#
|
||||
# PROJEKTERWEITERUNGEN gegenüber neckbeard v0.1.1 (Original:
|
||||
# docs/sources/upstream/neckbeard-v0.1.1/schema.yaml; Design:
|
||||
# docs/design/2026-08-11-neckbeard-migration.md, ADR-0012/0013):
|
||||
# docs/design/done/2026-08-11-neckbeard-migration.md, ADR-0012/0013):
|
||||
# * issue: Pflichtfelder milestone (M1–M5) + priority; Status-Enum um
|
||||
# next/waiting erweitert; due/host/area/wartegrund/gitlab_iid;
|
||||
# Regel waiting_requires_reason; globale Regel wip_limit (max. 2
|
||||
|
||||
Reference in New Issue
Block a user