Went through the seven imported waiting issues and replaced the generic
'reason is in the GitLab history' placeholder with the real blocker, which
completes #0041. Three of the seven were not merely imprecise but wrong:
- #0025: the deploy had long landed; screenshots confirm 24 aggregated messages
in the security room (limit 29), summing to the known 126 CRITICALs.
- #0014: the A/B/C decision exists as ADR-0008 (option A). Half its open question
is now answered — MATRIX has no docker group at all, so the root-equivalence
does not apply there.
- #0027: the blocking Struktur-Workshop happened on 2026-08-06 and produced three
ADRs, but W1 and W3 were spot-checked and are still unresolved.
The remaining four wait on a named action by sorb. Measured from here: the GAME
exporters are still filtered (and their silences expired on 2026-08-04, so
TargetDown has been firing every 4h since), while CFGMON's 9090/3100 are already
closed from the internet — so #0008 is about making that state deliberate rather
than an acute exposure.
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
The design doc closes with its AAR (planned/actual/why/learnings, the
six acceptance criteria checked off 6/6, the session's shakiest calls
named) and moves to docs/design/done/ with status done. Harvest: a
stolpersteine wiki page distilled from the AAR (hex is not a git SHA,
TZ on the git process, python floor, anonymous Gitea negatives,
negative tests, directory links), and the neckbeard feedback list
becomes issue 0040 - a deliberate separate act, per the design's
non-goals. Operational follow-up is issues 0041 (refine imported
wartegrund) and 0042 (go-live: push, first mirror run, CI schedule,
milestone for gitops#61). Final chain green: validate 0/0 over 36 open
issues, gen_status --check current, drift 0, prosa 0.
Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>