docs(issues): close #0042 - the schedule step was already satisfied
Steps 2 and 4 were done today with the first mirror run and the milestone on gitops#61. Step 3 turned out to need nothing: gruppenpruefung carries the same schedule rule as stillstandspruefung, and the single daily schedule therefore runs both. Verified on pipeline 472 rather than inferred - both jobs ran, both ended red, which is the alarm doing its job. What that leaves is a naming trap worth stating: the schedule is called "Stillstandsprüfung (täglich)", so nobody looking for the group check finds it there, and disabling the schedule for one reason silently disables the other check too. Renaming is a click and belongs to sorb. Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
This commit is contained in:
co-authored by
Claude Opus 5
parent
6fb3cb7fed
commit
f8c2621607
@@ -2,9 +2,9 @@
|
||||
|
||||
<!-- Generated by scripts/gen_status.py — do not edit. -->
|
||||
|
||||
## Issues (63 open, 33 closed)
|
||||
## Issues (62 open, 34 closed)
|
||||
|
||||
Verteilung: M1 16 · M2 17 · M3 4 · M4 11 · M5 15
|
||||
Verteilung: M1 16 · M2 16 · M3 4 · M4 11 · M5 15
|
||||
|
||||
| Issue | Status | Meilenstein | Priorität | Title |
|
||||
|---|---|---|---|---|
|
||||
@@ -25,7 +25,6 @@ Verteilung: M1 16 · M2 17 · M3 4 · M4 11 · M5 15
|
||||
| [0033](docs/issues/0033-overmind-01-element-desktop-build-lab-registry.md) | open | M2 | low | OVERMIND-01 — element-desktop-build von rohana in die Lab-Registry umziehen |
|
||||
| [0034](docs/issues/0034-cfgmon-11-gitea-ci-rueckbau-abschliessen.md) | open | M2 | medium | CFGMON-11 — Gitea-CI-Rückbau abschließen (sicher rückbaubare Schritte) |
|
||||
| [0040](docs/issues/0040-neckbeard-rueckmeldungen-einreichen.md) | open | M2 | low | neckbeard-Rückmeldungen aus dem Feldtest einreichen |
|
||||
| [0042](docs/issues/0042-migration-in-betrieb-nehmen-push-spiegel-schedule.md) | open | M2 | high | Migration in Betrieb nehmen: Push, erster Spiegel-Lauf, CI-Schedule |
|
||||
| [0051](docs/issues/0051-cve-remediation-pass.md) | open | M5 | high | CVE-Remediation-Pass: Schwachstellen-Report abarbeiten |
|
||||
| [0053](docs/issues/0053-historien-durchgang-nicht-kanonische-commits.md) | open | M2 | low | Historien-Durchgang: acht nicht-kanonische Commits mitziehen |
|
||||
| [0056](docs/issues/0056-gitops-9-external-postgresql-migration-cloudnativepg-o.md) | open | M1 | high | External PostgreSQL Migration: CloudNativePG or Hetzner |
|
||||
|
||||
@@ -1,7 +1,7 @@
|
||||
---
|
||||
type: issue
|
||||
id: "0042"
|
||||
status: open
|
||||
status: done
|
||||
created: 2026-08-11
|
||||
milestone: M2
|
||||
priority: high
|
||||
@@ -28,3 +28,28 @@ gitlab_iid: "36"
|
||||
4. gitops#61 einen Meilenstein geben (M1 oder M5 an der
|
||||
ADR-0010-Trennlinie) — der rote Befund der Gruppenprüfung ist die
|
||||
Erinnerung.
|
||||
|
||||
## Erledigt 2026-08-18 — alle vier Schritte
|
||||
|
||||
**Schritt 2, erster Spiegel-Lauf:** ausgeführt (von sorb freigegeben). 17 Aktionen:
|
||||
sieben Neuanlagen (`management#33`–`#39`), fünf Schließungen, zwei Wiederöffnungen,
|
||||
drei Label-/Meilenstein-Korrekturen. Die vergebenen iids sind zurückgeschrieben —
|
||||
das Skript tut das inzwischen selbst, sonst legte der nächste Lauf Duplikate an.
|
||||
Die Hinweise der Gruppenprüfung sind von 7 auf **0** gefallen.
|
||||
|
||||
**Schritt 4, Meilenstein für gitops#61:** M1 gesetzt (jetzt [#0091](0091-gitops-61-enrollment-kollidierender-localpart-uebernimm.md),
|
||||
inzwischen geschlossen — der Fix war längst ausgerollt).
|
||||
|
||||
**Schritt 3, CI-Schedule: war bereits erfüllt, nur nicht als solcher erkennbar.**
|
||||
Der Job `gruppenpruefung` trägt dieselbe Regel wie `stillstandspruefung`
|
||||
(`CI_PIPELINE_SOURCE == "schedule"`), und es gibt genau einen Zeitplan — `42 0 * * *`.
|
||||
Der fährt damit **beide** Jobs. Nachgeprüft an der letzten Schedule-Pipeline (472,
|
||||
2026-08-17 22:43): `gruppenpruefung` und `stillstandspruefung` sind beide gelaufen.
|
||||
Beide endeten rot, und das ist die Alarmfunktion, nicht ihr Defekt — die Gruppenprüfung
|
||||
verlässt sich mit Exit 1 bei Befunden genau darauf.
|
||||
|
||||
⚠️ **Stolperstein, bewusst benannt statt behoben:** Der Zeitplan heißt
|
||||
„Stillstandsprüfung (täglich)". Wer nach der Gruppenprüfung sucht, findet sie dort nicht
|
||||
— und wer den Zeitplan wegen der Stillstandsprüfung abschaltet, schaltet unbemerkt die
|
||||
Gruppenprüfung mit ab. Umbenennen (etwa „Nächtliche Prüfungen") ist ein Handgriff auf
|
||||
GitLab und liegt bei sorb.
|
||||
|
||||