Steps 2 and 4 were done today with the first mirror run and the milestone on
gitops#61. Step 3 turned out to need nothing: gruppenpruefung carries the same
schedule rule as stillstandspruefung, and the single daily schedule therefore runs
both. Verified on pipeline 472 rather than inferred - both jobs ran, both ended
red, which is the alarm doing its job.
What that leaves is a naming trap worth stating: the schedule is called
"Stillstandsprüfung (täglich)", so nobody looking for the group check finds it
there, and disabling the schedule for one reason silently disables the other check
too. Renaming is a click and belongs to sorb.
Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
The mirror created the seven issues that had never reached the board
(management#33-39) and wrote each new iid back into its file. Without the
writeback the next run would create duplicates instead of recognising its own
work.
Group check after the run: the issue drift class is empty - 27 findings down to
20, 7 hints to 0, and not a single GitLab issue without a canonical file. What
remains is unrelated to the board: seventeen commit-hygiene findings parked in
#0053 and three component declarations.
Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
Frozen handoff record for the upstream repo, English per neckbeard's
own artifact convention: the completed first size-L run (the ADR-0006
v1.0.0 trigger), eleven feedback items each with field evidence and
reference implementations, and a where-to-look table. Issue 0040 now
points at it; go-live item 1 in issue 0042 is ticked off by this push.
Size S under the granted exception - one deliverable, no design
decisions.
Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
The design doc closes with its AAR (planned/actual/why/learnings, the
six acceptance criteria checked off 6/6, the session's shakiest calls
named) and moves to docs/design/done/ with status done. Harvest: a
stolpersteine wiki page distilled from the AAR (hex is not a git SHA,
TZ on the git process, python floor, anonymous Gitea negatives,
negative tests, directory links), and the neckbeard feedback list
becomes issue 0040 - a deliberate separate act, per the design's
non-goals. Operational follow-up is issues 0041 (refine imported
wartegrund) and 0042 (go-live: push, first mirror run, CI schedule,
milestone for gitops#61). Final chain green: validate 0/0 over 36 open
issues, gen_status --check current, drift 0, prosa 0.
Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>